Surveying glossary

Short definitions of surveying terms, from PLSS corners and units to leveling, curves, datums and boundary law, with the official sources they rest on.

Sources reviewed

This glossary defines the surveying terms used across the FS, PS and PLSS exam guides, in alphabetical order. Each definition is a short plain-language summary. Where a definition rests on an official document, such as the BLM Manual of Surveying Instructions or an NGS or NIST page, the entry links it and the sources box at the end lists it. Boundary-law terms vary by state, so those entries give only the general meaning, and the law of your state governs.

A

Accretion
The slow, gradual buildup of land along a shore or bank as water deposits soil against it. As a general rule a boundary that follows the water moves with accretion, but state law governs the details.
See also: Avulsion, Riparian rights, Meander line
Acre
A unit of area equal to 43,560 square feet, which is also 10 square chains or 160 square rods. Six hundred forty acres make one square mile, the nominal area of a regular PLSS section.
Explained in: Area by coordinates
See also: Chain, Rod, Section
Source: NIST revised unit conversion factors
Adverse possession
A way title to land can pass to someone who has occupied it openly and without the owner's permission for a period set by statute. The required elements and the time period differ from state to state, so state law decides whether a claim succeeds.
See also: Senior rights, Easement, Deed
Aliquot part
An exact fraction of a section made by halving or quartering it, such as the NE¼ or the SW¼ SE¼. In a regular 640-acre section its nominal area is 640 acres times each fraction in its description, so a quarter-quarter section is 40 acres.
Explained in: PLSS aliquot parts
See also: Section, Government lot, Legal description
Source: BLM Manual of Surveying Instructions (2009)
Angular misclosure
The amount by which the sum of the measured interior angles of a closed traverse differs from the geometric total of (n − 2) × 180°, where n is the number of angles. It is balanced among the angles before bearings or azimuths are computed.
Explained in: Traverse closure
See also: Misclosure, Linear misclosure, Closed traverse
Avulsion
A sudden, plainly visible change in a shoreline or channel, such as a river cutting a new course during a flood. As a general rule a boundary does not move with an avulsion and stays where it was, but state law governs the details.
See also: Accretion, Riparian rights
Azimuth
A direction given as a horizontal angle measured clockwise from north, from 0° up to 360°. The north reference can be true, grid, magnetic or assumed, so a survey should state which one it uses.
Explained in: Traverse closure
See also: Bearing, Back azimuth, Deflection angle, Latitude

B

Back azimuth
The azimuth of a line taken in the opposite direction, found by adding 180° to the forward azimuth, or subtracting 180° if the sum would pass 360°. On long lines referenced to true north the two differ by slightly more or less than 180° because meridians converge.
See also: Azimuth, Bearing
Backsight
In leveling, a rod reading taken on a point of known elevation, added to that elevation to give the height of instrument. In traversing, it is the sight back to the previous station that orients the instrument.
Explained in: Differential leveling
See also: Foresight, Height of instrument (HI), Turning point (TP), Benchmark
Base line
The east-west line run along a true parallel of latitude through the initial point, the origin of a rectangular survey. Township numbers count north and south from it.
Explained in: PLSS aliquot parts
See also: Principal meridian, Township, Standard parallel, Baseline (GNSS)
Source: BLM Manual of Surveying Instructions (2009)
Baseline (GNSS)
The three-dimensional vector between two GNSS receivers that observed at the same time, computed from their carrier-phase data as differences in coordinates. Networks of baselines are adjusted together to produce positions.
See also: RTK, PDOP, Base line
Bearing
A direction given as an angle of 0° to 90° measured east or west from north or south, such as N 38° 15′ 20″ E. The quadrant letters give the signs of the latitude and departure.
Explained in: Traverse closure
See also: Azimuth, Back azimuth, Latitude, Departure
Benchmark
A permanent, well-described mark whose elevation is known and published or established. Level circuits start and close on benchmarks.
Explained in: Differential leveling
See also: Backsight, Misclosure, NAVD 88, Orthometric height

C

Chain
The unit of length the law prescribes for surveys of the public lands: 66 U.S. survey feet, divided into 100 links of 0.66 foot each. Eighty chains make a mile and 10 square chains make an acre.
Explained in: PLSS aliquot parts
Calculator: Unit converter
See also: Acre, Rod, Section, U.S. survey foot
Source: BLM Manual of Surveying Instructions (2009)
Closed traverse
A traverse that either returns to its starting point (a loop) or ends on another point of known position, so its measurements can be checked for closure. Only a loop encloses an area, and its latitudes and departures each add to zero once adjusted.
Explained in: Traverse closure
See also: Latitude, Departure, Linear misclosure, Compass rule
Closing corner
A PLSS corner set where a survey line ends against a line already established, such as a range line from the south meeting a standard parallel. Its correct position is on the line closed upon, at the true point where the two lines intersect.
See also: Standard corner, Standard parallel, Single proportionate measurement
Source: BLM Manual of Surveying Instructions (2009)
Collimation error
The small tilt of a level's line of sight above or below true horizontal when the instrument indicates it is level. Its effect on a reading grows in proportion to the sight length, so it cancels when backsight and foresight lengths are kept equal.
Explained in: Differential leveling
See also: Curvature and refraction, Systematic error, Backsight, Foresight
Combined factor
The product of the grid scale factor and the elevation (height) factor at a point, giving the total linear distortion there. A horizontal ground distance times the combined factor gives the grid distance, and a grid distance divided by it gives the ground distance.
Explained in: Grid and ground
See also: Grid scale factor, Elevation factor, Grid distance
Source: NGS SPCS2022 Procedures (NGS 2023-1214-03-A3)
Compass rule
A traverse adjustment, also called the Bowditch rule, that corrects each course's latitude and departure in proportion to the course length divided by the perimeter. The transit rule, a less common alternative, instead corrects each latitude and departure in proportion to its own size.
Explained in: Traverse closure
See also: Latitude, Departure, Linear misclosure, Relative precision
Coordinate method
A way to find the area of a closed figure by cross-multiplying each corner's northing with the next corner's easting, and each easting with the next northing, then halving the difference of the two sums. It is also called the cross-multiplication or shoelace method.
Explained in: Area by coordinates
See also: Double meridian distance (DMD), Closed traverse, Acre
Curvature and refraction
The combined effect of the earth's level surface falling away from a horizontal line of sight and the atmosphere bending that sight back down. It is about 0.0206 ft times the square of the sight length in thousands of feet, and it cancels when sights are balanced.
Explained in: Differential leveling
See also: Collimation error, Systematic error

D

Deed
The written instrument by which an owner conveys title to land. Its description, and any plat or survey it refers to, is the starting record for a boundary retracement; state law governs how deeds are made, recorded and interpreted.
See also: Legal description, Metes and bounds, Plat, Senior rights
Deflection angle
In traversing, the angle from the extension of the previous line to the next line, noted as right or left. In curve layout, it is the angle at the PC between the tangent and the chord to a point on the curve, equal to half the central angle of the arc to that point.
Explained in: Horizontal curves
See also: Azimuth, Point of curvature (PC), Intersection angle (Δ)
Degree of curve
A measure of how sharp a circular curve is. By the arc definition it is the central angle that cuts off 100.00 ft of arc, so D = 5,729.58 / R with R in feet; railroad work has used a chord definition based on a 100 ft chord, which gives slightly different values.
Explained in: Horizontal curves
See also: Intersection angle (Δ), Station
Departure
The east-west component of a traverse course: its length times the sine of its azimuth, which is also the change in easting from its start to its end. East is positive and west is negative.
Explained in: Traverse closure
See also: Latitude, Closed traverse, Double meridian distance (DMD)
Double meridian distance (DMD)
Twice the east-west distance from a reference meridian, usually run through the most westerly corner, to the midpoint of a course. The DMD times the course latitude gives a double area, and half the sum of the double areas is the area of the figure.
Explained in: Area by coordinates
See also: Coordinate method, Latitude, Departure
Double proportionate measurement
A method of restoring a lost PLSS corner from four found corners, two on the north-south line through it and two on the east-west line. The corners north and south fix its north-south position, the corners east and west fix its east-west position, and record directions are generally disregarded. The Manual treats it as generally applicable to lost corners of four townships and lost interior corners of four sections.
Explained in: Lost corners
See also: Single proportionate measurement, Lost corner, Retracement
Source: BLM Manual of Surveying Instructions (2009)

E

Easement
A right to use another person's land for a particular purpose, such as access, utilities or drainage, without owning it. Easements can arise by deed, by plat, by long use or by necessity, and state law governs how they are created and ended.
See also: Deed, Plat, Adverse possession
Elevation factor
The ratio that reduces a horizontal distance at the ground to the ellipsoid, R / (R + h), where h is the ellipsoid height and R is the earth's radius at the point; NGS uses the GRS 80 mean radius of curvature at its latitude. NGS now calls it the height factor.
Explained in: Grid and ground
See also: Combined factor, Grid scale factor, Ellipsoid height
Source: NGS SPCS2022 Procedures (NGS 2023-1214-03-A3)
Ellipsoid height
How far a point sits above or below the reference ellipsoid, which is a smooth mathematical model of the earth's shape such as GRS 80. GNSS observations give it, and a geoid model converts it to an orthometric height: it equals the orthometric height plus the geoid height.
Explained in: Grid and ground
See also: Orthometric height, Geoid height, Geoid, NAD 83
Source: NGS GEOID18 page
Existent corner
A PLSS corner whose original position can still be identified, whether from the monument and its accessories, the field notes, a later survey record, other physical evidence or reliable testimony. The Manual's test is substantial evidence: evidence a reasonable person could rely on for the conclusion, more than a mere hint but short of showing it more likely than not.
Explained in: Lost corners
See also: Obliterated corner, Lost corner, Monument
Source: BLM Manual of Surveying Instructions (2009)

F

Foresight
In leveling, a rod reading taken on a point whose elevation is wanted, subtracted from the height of instrument. In traversing, it is the sight ahead to the next station.
Explained in: Differential leveling
See also: Backsight, Height of instrument (HI), Turning point (TP)

G

Geoid
The reference surface for heights: a surface on which the earth's gravity potential is the same everywhere, chosen to match global mean sea level as closely as possible. Orthometric heights are measured from it, and across the conterminous United States it lies below the ellipsoid.
Explained in: Grid and ground
See also: Geoid height, Orthometric height, Ellipsoid height, NAVD 88
Source: NGS geoid definition page
Geoid height
The separation between the geoid and the ellipsoid at a point, usually written N and taken from a geoid model such as GEOID18. It is negative where the geoid lies below the ellipsoid, as it does across the conterminous United States.
Explained in: Grid and ground
See also: Geoid, Ellipsoid height, Orthometric height
Source: NGS geoid definition page
Government lot
A numbered lot on an official PLSS plat for land that is not described as a regular aliquot part, such as along the north and west boundaries of a township, where lots take up the convergence and the excess or deficiency in measurement, or where a section is cut by a meandered body of water. Its area is the one returned on the plat.
Explained in: PLSS aliquot parts
See also: Aliquot part, Section, Meander line, Plat
Source: BLM Manual of Surveying Instructions (2009)
Grid distance
The distance between two points computed from their map projection coordinates, such as state plane northings and eastings. It almost always differs from the horizontal distance on the ground, usually being shorter, and is found approximately by multiplying the ground distance by the combined factor.
Explained in: Grid and ground
See also: Combined factor, State Plane Coordinate System (SPCS), Grid scale factor
Source: NOAA Special Publication NOS NGS 13 (State Plane Coordinate System)
Grid scale factor
The ratio of a length on the map projection grid to the same length on the reference ellipsoid at a point, often written k. It is the distortion caused by projecting the curved ellipsoid onto a plane, and it depends only on horizontal position within the zone, not on height.
Explained in: Grid and ground
See also: Combined factor, Elevation factor, State Plane Coordinate System (SPCS)
Source: NGS SPCS2022 Procedures (NGS 2023-1214-03-A3)

H

Height of instrument (HI)
In leveling, the elevation of the level's horizontal line of sight at one setup, equal to the elevation of the backsight point plus the backsight reading. In total station work the same term means the height of the instrument above the occupied mark.
Explained in: Differential leveling
See also: Backsight, Foresight, Benchmark

I

International foot
The foot defined as exactly 0.3048 meter, adopted in 1959. Since January 1, 2023 it has superseded the U.S. survey foot in all applications except historic and legacy work, and it may be called simply the foot. It is about 2 parts per million shorter than the U.S. survey foot.
Calculator: Unit converter
See also: U.S. survey foot, Chain
Source: NIST U.S. survey foot page
Intersection angle (Δ)
The angle between the back tangent extended through the PI and the ahead tangent of a horizontal curve, written Δ (delta). It equals the central angle of the curve.
Explained in: Horizontal curves
See also: Point of intersection (PI), Tangent distance (T), Deflection angle

L

Latitude
The north-south component of a traverse course: its length times the cosine of its azimuth, which is also the change in northing from its start to its end. North is positive and south is negative.
Explained in: Traverse closure
See also: Departure, Closed traverse, Double meridian distance (DMD)
Linear misclosure
The straight-line distance between the starting point and the computed end point of a closed traverse, the square root of the sum of the squared latitude and departure errors. Also called the linear error of closure.
Explained in: Traverse closure
See also: Misclosure, Relative precision, Compass rule
Long chord (LC)
The straight line from the PC to the PT of a horizontal curve, LC = 2 × R × sin(Δ/2). It is always shorter than the arc.
Explained in: Horizontal curves
See also: Point of curvature (PC), Point of tangency (PT), Middle ordinate
Lost corner
A PLSS corner whose original position cannot be fixed by substantial evidence of any kind, whether traces of the marks, records or testimony. Its position can be put back only from its relation to other corners it depends on, usually by proportionate measurement.
Explained in: Lost corners
See also: Existent corner, Obliterated corner, Single proportionate measurement, Double proportionate measurement
Source: BLM Manual of Surveying Instructions (2009)

M

Meander line
A traverse run along the bank of a permanent natural body of water in a public land survey, used to compute the area of the upland and to plat the shore. In an original survey it is generally not the boundary: the ordinary high water mark, or the line of mean high tide, is.
See also: Government lot, Riparian rights, Accretion
Source: BLM Manual of Surveying Instructions (2009)
Metes and bounds
A way of describing land by its perimeter: a point of beginning, then each course's direction and length (the metes) and the monuments, features or adjoining owners along it (the bounds). It is the usual form of description outside the PLSS and is also used within it.
See also: Legal description, Deed, Monument, Senior rights
Middle ordinate
On a horizontal curve, the distance from the midpoint of the long chord to the midpoint of the arc, M = R × (1 − cos(Δ/2)). On a vertical curve the name is also used for the vertical distance e between the PVI and the curve, e = A × L / 800 with A in percent and L in feet.
Explained in: Horizontal curves
See also: Long chord (LC), Point of vertical intersection (PVI)
Misclosure
The amount by which a computed value misses the known value it should match, taken as computed minus known. In a level circuit it is the computed elevation of the closing benchmark minus its known elevation, and corrections of the opposite sign are spread through the circuit.
Explained in: Differential leveling
See also: Angular misclosure, Linear misclosure, Benchmark, Relative precision
Monument
A physical object that marks a survey corner or point, such as an iron pipe, a capped post, a marked stone or a marked tree. In boundary work an identified original monument generally carries more weight than record courses and distances, with the order of priority set by state law.
Explained in: Lost corners
See also: Existent corner, Witness corner, Metes and bounds

N

NAD 83
The North American Datum of 1983, the horizontal and geometric datum for the United States, Canada, Mexico and Central America, released in 1986 and based on the GRS 80 ellipsoid. It has been readjusted several times on the same datum, and for current surveys in the conterminous United States NGS names the NAD 83(2011) epoch 2010.00 realization.
Explained in: Grid and ground
See also: State Plane Coordinate System (SPCS), Ellipsoid height, NAVD 88
Source: NGS NAD 83 page

O

Obliterated corner
An existent PLSS corner with no trace of its monument or accessories left at the original spot, whose position can still be recovered by substantial evidence such as reliable testimony, the acts of owners and surveyors, or an acceptable record. It is used where the evidence puts it, not restored by proportion.
Explained in: Lost corners
See also: Existent corner, Lost corner, Monument
Source: BLM Manual of Surveying Instructions (2009)
Orthometric height
Height above the geoid, which is what surveyors mean by elevation, for example an elevation on NAVD 88. It equals the ellipsoid height minus the geoid height, which is how a geoid model such as GEOID18 turns a GNSS height into an elevation.
Explained in: Grid and ground
See also: Geoid, Ellipsoid height, Geoid height, NAVD 88
Source: NGS GEOID18 page

P

PDOP
Position dilution of precision, a number that describes how the geometry of the satellites in view affects the precision of a GNSS position. Lower values are better, because satellites spread across the sky give a stronger fix than satellites bunched together.
See also: RTK, Baseline (GNSS), Standard deviation
Plat
A scaled drawing of a survey or subdivision showing boundaries, dimensions, monuments and parcel or lot numbers. An official PLSS plat, or a plat recorded under state law, can become part of the legal description of the land it shows.
Explained in: PLSS aliquot parts
See also: Legal description, Deed, Government lot
Point of curvature (PC)
The point where an alignment leaves the back tangent and the circular arc begins. Its station is the PI station minus the tangent distance.
Explained in: Horizontal curves
See also: Point of intersection (PI), Point of tangency (PT), Tangent distance (T)
Point of intersection (PI)
The point where the back tangent and the ahead tangent of an alignment meet when extended. The curve does not pass through it.
Explained in: Horizontal curves
See also: Point of curvature (PC), Point of tangency (PT), Intersection angle (Δ)
Point of tangency (PT)
The point where the circular arc ends and the alignment continues along the ahead tangent. Its station is the PC station plus the arc length, not the PI station plus the tangent distance.
Explained in: Horizontal curves
See also: Point of curvature (PC), Point of intersection (PI), Station
Point of vertical curvature (PVC)
The point where a vertical curve leaves the entering grade, also called the BVC. On an equal-tangent curve it lies half the curve length before the PVI, measured horizontally.
Explained in: Vertical curves
See also: Point of vertical intersection (PVI), Point of vertical tangency (PVT), Rate of change of grade
Point of vertical intersection (PVI)
The point on a profile where the entering and exiting grade lines meet when extended. It is a design point on the tangents, not a point on the curve.
Explained in: Vertical curves
See also: Point of vertical curvature (PVC), Point of vertical tangency (PVT), Middle ordinate
Point of vertical tangency (PVT)
The point where a vertical curve joins the exiting grade, also called the EVC. On an equal-tangent curve it lies half the curve length past the PVI, measured horizontally.
Explained in: Vertical curves
See also: Point of vertical curvature (PVC), Point of vertical intersection (PVI), Rate of change of grade
Principal meridian
The north-south line run on the true meridian through the initial point of a rectangular survey. Range numbers count east and west from it, and each principal meridian controls the surveys in its own region.
Explained in: PLSS aliquot parts
See also: Base line, Range, Township
Source: BLM Manual of Surveying Instructions (2009)

R

Random error
An error left after blunders and systematic errors are removed, varying unpredictably in size and sign from one measurement to the next. Random errors partly cancel, are treated with probability, and in a sum grow with the square root of the number of measurements.
See also: Systematic error, Standard deviation, Relative precision
Range
Townships lined up one above another from south to north make a range. Ranges are counted east or west from the principal meridian, as in R. 3 E., and a range number with a township number names one township.
Explained in: PLSS aliquot parts
See also: Township, Principal meridian, Section
Source: BLM Manual of Surveying Instructions (2009)
Rate of change of grade
The change in grade per station along a vertical curve, r = A / L, where A = g2 − g1 is the algebraic difference in grades in percent and L is the curve length in stations. It is constant on a parabolic curve, negative on a crest and positive on a sag. The related K value, L / |A| with L in feet, is the curve length per 1% of grade change.
Explained in: Vertical curves
See also: Point of vertical curvature (PVC), Point of vertical tangency (PVT), Middle ordinate
Relative precision
The linear misclosure compared with the traverse perimeter (the total length of its courses), written as 1 in N, where N is the perimeter divided by the misclosure. A larger N means a better closure.
Explained in: Traverse closure
See also: Linear misclosure, Compass rule, Misclosure
Retracement
A survey that runs the lines of an earlier survey on the ground to recover its monuments and find how the measured directions and lengths compare with the record. In the PLSS the original lines are retraced between found corners before any lost corner is restored.
Explained in: Lost corners
See also: Lost corner, Single proportionate measurement, Double proportionate measurement
Source: BLM Manual of Surveying Instructions (2009)
Riparian rights
Rights that go with owning land beside a river, stream or lake, such as access to the water and having the boundary follow gradual changes in the bank. Their scope differs between states and between navigable and non-navigable waters, so state law, and federal law for some waters, governs.
See also: Accretion, Avulsion, Meander line
Rod
A unit of length equal to 16.5 feet, one quarter of a chain, also called a pole or perch. In leveling the word also means the graduated staff held on a point and read through the instrument.
Calculator: Unit converter
See also: Chain, Acre
Source: NIST revised unit conversion factors
RTK
Real-time kinematic GNSS surveying, in which a base receiver or network on known positions sends carrier-phase corrections to a roving receiver so the rover gets centimeter-level positions as it works. The results depend on solving the carrier-phase ambiguities and on the base coordinates being right.
See also: Baseline (GNSS), PDOP

S

Section
The unit of subdivision in the PLSS, nominally 1 mile (80 chains) square and 640 acres. Sections are numbered 1 to 36 within a township, starting in the northeast section and running back and forth to 36 in the southeast section.
Explained in: PLSS aliquot parts
See also: Township, Aliquot part, Government lot, Chain
Source: BLM Manual of Surveying Instructions (2009)
Senior rights
The principle that when parcels conveyed one after another by the same owner overlap, the parcel conveyed first generally takes priority and the later, junior parcel bears the shortage. It does not apply to parcels created at the same moment, such as lots on one plat, and state law governs.
See also: Deed, Legal description, Metes and bounds
Single proportionate measurement
A method of restoring a lost PLSS corner on a line between two found corners on that line, giving each interval a share of the difference between the record and measured lengths in proportion to its record length. It is used for corners such as quarter corners between section corners, corners on standard parallels and intermediate corners on township lines.
Explained in: Lost corners
See also: Double proportionate measurement, Lost corner, Retracement
Source: BLM Manual of Surveying Instructions (2009)
Standard corner
A PLSS corner set on a standard parallel or base line when that line was first run, controlling the townships and sections to the north. Corners set later on the same line, where lines from the south close on it, are closing corners.
See also: Closing corner, Standard parallel, Base line
Source: BLM Manual of Surveying Instructions (2009)
Standard deviation
A measure of how widely repeated measurements spread about their mean: the square root of the sum of the squared residuals divided by one less than the number of measurements. About 68 percent of normally distributed random errors fall within one standard deviation of the mean.
See also: Random error, Systematic error, Relative precision
Standard parallel
An east-west line run along a true parallel of latitude, normally placed at 24-mile intervals on both sides of the base line, on which full township widths are measured again to take up the convergence of meridians. It was first called a correction line.
Explained in: PLSS aliquot parts
See also: Base line, Standard corner, Closing corner, Township
Source: BLM Manual of Surveying Instructions (2009)
State Plane Coordinate System (SPCS)
A set of conformal map projection zones that turns latitude and longitude into flat grid coordinates, northings and eastings, for surveying, engineering and mapping across the United States and its territories; it dates from the 1930s. Conformal means the scale at a point is the same in every direction. Its versions are named for their years, such as SPCS 27 and SPCS 83.
Explained in: Grid and ground
See also: Grid scale factor, Grid distance, NAD 83
Source: NGS State Plane Coordinate System page
Station
A distance measured along an alignment from its starting point, written as hundreds of feet plus feet, so 47+82.36 is 4,782.36 ft from the start. One full station is 100 ft.
Explained in: Horizontal curves
See also: Point of curvature (PC), Point of tangency (PT), Degree of curve
Systematic error
An error that follows a physical or mathematical rule, so under the same conditions it keeps the same sign and often a predictable size, such as a tape that is too long, collimation error or curvature and refraction. It does not cancel by repeating the measurement and is removed by calibration, computed corrections or field procedure.
Explained in: Differential leveling
See also: Random error, Collimation error, Curvature and refraction

T

Tangent distance (T)
The straight distance from the PC to the PI, equal to the distance from the PI to the PT on a simple curve, T = R × tan(Δ/2).
Explained in: Horizontal curves
See also: Point of curvature (PC), Point of intersection (PI), Intersection angle (Δ)
Township
The unit of survey in the PLSS, nominally 6 miles square and holding 36 sections. The word also means a tier of townships numbered north or south of the base line, as in T. 4 S.
Explained in: PLSS aliquot parts
See also: Range, Section, Base line
Source: BLM Manual of Surveying Instructions (2009)
Turning point (TP)
In leveling, a firm temporary point that takes a foresight from one setup and a backsight from the next, carrying the elevation forward. On a vertical curve the same name is sometimes used for the high or low point, where the grade of the curve is zero.
Explained in: Differential leveling
See also: Backsight, Foresight, Height of instrument (HI)

U

U.S. survey foot
The foot defined as exactly 1200/3937 meter, about 0.3048006 meter, long kept for U.S. geodetic surveying. NIST and NGS made it obsolete from January 1, 2023 except for historic and legacy work, but many existing records rest on it, since units such as the chain, link, rod and acre were defined only through it before then.
Explained in: PLSS aliquot parts
Calculator: Unit converter
See also: International foot, Chain
Source: NIST U.S. survey foot page

W

Witness corner
A monument set near a PLSS corner, preferably within 10 chains of it, when the true corner falls where a monument cannot be set or occupied, such as on a cliff. The field notes record its course and distance to the true corner, so finding it recovers the corner; it does not take the corner's place.
Explained in: Lost corners
See also: Monument, Existent corner
Source: BLM Manual of Surveying Instructions (2009)

Official sources

Sources reviewed

SurveyingExamPrep is independent and is not affiliated with or endorsed by NCEES or any state licensing board. Rules, fees and dates change, so confirm them with NCEES and your board before you apply.